Ski Resorts News
12/09/2018
Andermatt takes on village character around Piazza Gottardo Hotel Radisson Blu Reussen and Gotthard Residences open in December.

In Andermatt Reuss, rapid progress will be seen at Piazza Gottardo over the next few weeks: After an intensive construction period, Hotel Radisson Blu Reussen and the Gotthard Residences will open in mid-December. The apartments in House Alpenrose will soon be handed over to theirowners, and Restaurant Biselli on the ground floor will also be finished by mid-December.
The first phase around Piazza Gottardo is winding up. With the completion of Hotel Radisson Blu Reussen, with 179 rooms, the Gotthard Residences, with 65 suites and apartments, andapartment house Alpenrose, Andermatt Reuss is now taking onvillage character and becoming a lively place. The Victorinox store is already open, and a Mammut store in alliancewith Imholz Sport AG will open on the ground floor of House Edelweiss before Christmas.
The interior build-out of Restaurant Biselli on the ground floor of House Alpenrose is also progressing on schedule. In addition to the restaurant, a bakery, a chocolateria and a small shop are integrated. In summer, the restaurant in Piazza Gottardo will become a garden restaurant. The piazza also features a fountainand attractive planting. A stairwayis being built between House Alpenrose and the Gotthard Residences that leads directly to the train station and the historic centre.
Another highlight is the spacious and modern wellness and fitness zone which includestwo saunas, steam bath and 13 treatment rooms for wellbeing and healthcare therapy. The fitness areais equipped with state-of-the-art Technogym equipment. The 25-metre-long public indoor pool with separate children's play pool featureswindows that extend to the floorin orderto giveaview of the mountains of the Ursern Valley.
Restaurant Spun is dedicated to carefully composed Swiss specialities and traditional fine Italian cuisine. The Bär Bar is ideal for a snack or a small in-between meal. The adjacent concert hall is currently being expandedto seat up to 700 guests. The design is by the British Studio Seilern Architects, which specialises in acoustic perfection. The concert hall will be inaugurated in spring 2019.
Two more apartment buildingsare being built: both Fuchs and Eisvogel have been under construction since this summer and autumn. At House Fuchs, only the roof remains to be installed, and at Eisvogel the first upper floor is already covered. The mild autumn allowed the construction work to advance considerably.
Latest Resort News

On 1st July 2023 the Matterhorn Glacier Ride II will enter service
A long-cherished vision becomes reality: a connection between Zermatt and the Italian resort of Cervinia, unbroken and operational throughout the year, thanks to the Matterhorn Alpine Crossing. As of 1 July 2023, the Matterhorn Glacier Ride II will be the final piece of the puzzle, as the highest continuous Alpine crossing by cable car is completed.
04/29/2023

Red Bull Hammers with Hommies final in Madonna di Campiglio.
Red Bull Hammers with Homies returns with the international final in Madonna di Campiglio. Crews from all over Europe will arrive at the spectacular Ursus Snowpark to compete for the victory hammer.
04/02/2023

Garaventa builds one of Switzerland’s biggest chairlifts in Villars resort
The fourth 8-seater chairlift in Switzerland went into service at the beginning of December 2022 in the Villars-Gryon-Diablerets ski area. The new ropeway means a significant increase in capacity for the trip from Villars to Les Diablerets.
03/16/2023