Ski Resorts News
10/10/2023
Two new ski lifts are being built for the upcoming winter season. The first bottom stage will start from the New Gudauri and will lift skiers almost till the upper stage of the Kudebi lift. It will be covered chair-type lifts with six seats. The length is approximately 1249 and 1369 meters, with a capacity of at least 1800 people per hour.
According to the application published on the State Procurement Agency’s website, plans are underway to construct two new ropeways in the scenic Gudauri region. The project will be spearheaded by MTA, a company under the Ministry of Economy’s jurisdiction.
Currently, Gudauri operates only one gondola-type cable car, which is consistently overwhelmed during the winter season and struggles to meet the increasing demand. To address this issue, the government intends to install two additional cable cars in the area. MTA’s primary objective is to offer visitors a seamless ascent to Mount Vartsla through these cable cars, with the new infrastructure being designed to serve up to 1,800 people per hour.
Due to the urgency of the project, the decision has been made to sign a contract with a supplier without conducting a tender process.
The implementation of the measures stipulated by the decree will contribute to the development of the mountain-ski resorts of Georgia, the encouragement of economic activity, the creation of additional jobs and the establishment of a competitive and stable investment environment in Gudauri. In addition, the construction of two new chairlifts on Mount Vartsla and the corresponding infrastructure will diversify the services in the Gudauri resort, which will contribute to the rapid development of the resort, the improvement of the existing infrastructure and, accordingly, the increase in the popularity of the resort both inside the country and abroad, which will positively affect the awareness of Georgian mountain and ski resorts and increase their competitiveness at the international level. Taking into account the above, the company’s goal is for the mountain-ski resorts in Georgia to improve the level of management and reach international standards in the field of safety and service, which will contribute to getting a proper experience, creating a pleasant and favorable environment for visitors, and increasing their confidence. The construction of new, modern high-standard and high-capacity cableways and ski tracks in the Gudauri resort will have a direct proportional impact on the income of the local population, small and medium-sized businesses, investors, the company and the state.
“Based on the above, taking into account the growing number of visitors and the promotion of international events, it is advisable to organize chairlifts in New Gudauri. The company developed a technical task and determined the criteria and characteristics, according to which two cableways of approximately 1249 and 1369 meters in length should be implemented, which will start from New Gudauri and end at the front slope of the trails, with 6-seater shielded (“Babliani”) cable cars with a capacity of no less than 1,800 people per hour,” the statement said.
Currently, Gudauri operates only one gondola-type cable car, which is consistently overwhelmed during the winter season and struggles to meet the increasing demand. To address this issue, the government intends to install two additional cable cars in the area. MTA’s primary objective is to offer visitors a seamless ascent to Mount Vartsla through these cable cars, with the new infrastructure being designed to serve up to 1,800 people per hour.
Due to the urgency of the project, the decision has been made to sign a contract with a supplier without conducting a tender process.
The implementation of the measures stipulated by the decree will contribute to the development of the mountain-ski resorts of Georgia, the encouragement of economic activity, the creation of additional jobs and the establishment of a competitive and stable investment environment in Gudauri. In addition, the construction of two new chairlifts on Mount Vartsla and the corresponding infrastructure will diversify the services in the Gudauri resort, which will contribute to the rapid development of the resort, the improvement of the existing infrastructure and, accordingly, the increase in the popularity of the resort both inside the country and abroad, which will positively affect the awareness of Georgian mountain and ski resorts and increase their competitiveness at the international level. Taking into account the above, the company’s goal is for the mountain-ski resorts in Georgia to improve the level of management and reach international standards in the field of safety and service, which will contribute to getting a proper experience, creating a pleasant and favorable environment for visitors, and increasing their confidence. The construction of new, modern high-standard and high-capacity cableways and ski tracks in the Gudauri resort will have a direct proportional impact on the income of the local population, small and medium-sized businesses, investors, the company and the state.
“Based on the above, taking into account the growing number of visitors and the promotion of international events, it is advisable to organize chairlifts in New Gudauri. The company developed a technical task and determined the criteria and characteristics, according to which two cableways of approximately 1249 and 1369 meters in length should be implemented, which will start from New Gudauri and end at the front slope of the trails, with 6-seater shielded (“Babliani”) cable cars with a capacity of no less than 1,800 people per hour,” the statement said.
In the new season 2023-2024, Georgia will give us twonew cable lifts and new tracks along them in Gudauri for the annual(!) World Cup stages.
The construction of the first cable car will cost 33,951,900 GEL, and the second - 32,481,300 GEL. The work is done by the Austrian company Doppelmayr.
The new Gudauri lifts will be chairlifts with wind protection, for 6 seats. Length 1.249 and 1.369 meters.
The planned launch of the cable cars is in December 2023.
Latest Resort News
Scheffau new 8-seater Eibergbahn
The 8-seater Scheffau Eibergbahn is the highest-capacity and one of the most energy self-sufficient chairlifts in the world. The new 8-seater Eibergbahn is being built on the same route and, with a dynamic transport capacity of up to 4,570 passengers per hour, will be the world’s most powerful detachable chairlift.
09/02/2024
New tram climbs Lucerne’s tallest mountain
An 80-passenger tramway has linked Sörenberg with Lucerne’s popular tallest mountain, the Brienzer Rothorn, since 1971. After more than 50 years’ service, the time had come to replace the tramway and its ropeway technology was entirely upgraded.
03/21/2024
Hauser Kaibling: Work On New 8 Seater Kaiblinggrat Chairlift Is Progressing
The Quattralpina lift, popular with many winter sports enthusiasts at Hauser Kaibling, is being retired. After 32 years and a total of approximately 27.4 million transported guests, it's coming to an end. Starting next winter, the new 8-seater chairlift Kaiblinggrat will begin operation.
08/21/2024