Ski Resorts News
09/10/2018
The new gondola Champoluc-Crest is beginning to take shape: work in progress for the realisation of the new lift that is going to replace the historical one, that was operating since 1983.
The previous line has been completely dismantled. The new line will be slightly turned to the north and will be extended by a few tens of meters. In the valley station there will be ticket offices and administrative offices, while the top station will be positioned in such a way as to create an interchange area with the Crest-Alpe Ostafa III gondola lift.
The new gondola lift will have a maximum hourly capacity of 2400 people, compared with 1800 for the old gondola lift, and the journey time will be 3'09 ". The plant will also have the function of Local Public Transport as it connects Champoluc with the high-altitude villages of the Municipality of Ayas.
Latest Resort News
The new Plateau chairlift will enrich the Kronplatz ski area
Kronplatz, one of the premier ski destinations in the Dolomites, has introduced a state-of-the-art 8-seater chairlift named Plateau for the 2024/25 winter season. Located in the Olang sector, this new chairlift replaces the previous 4-seater, offering a significant upgrade in comfort and efficiency.
11/28/2024
Gourette ski area modernization
Gourette ski resort in the French Pyrenees has undergone significant modernization efforts for the 2024/2025 season. These upgrades aim to improve accessibility, efficiency, and the overall skiing experience. This new project, presented on September 5th...
11/20/2024
New Jandri 3S gondola to open in Les 2 Alpes in December
Les Deux Alpes, one of France's premier ski resorts, is celebrating the arrival of its state-of-the-art Jandri Express gondola lift for the 2024/25 ski season. A total of 53 cabins manufactured at POMA-Sigma's Veyrins-Thuellins facility will be installed on the cables of a lift intended to replace the Jandri Express built in 1985.
11/20/2024